publicCanada — Englishexpand_more
STD: NORSOK M-630 / NACE MR0175REV 4.1.2025
precision_manufacturingAPPLICATION SPEC: SWRO-HP-2507 • SUPER DUPLEX & SUPER AUSTENITIC

Seawater Reverse Osmosis & High-Pressure Desalination Systems

Extreme chloride concentrations (up to 48,000 mg/L TDS) and operating pressures reaching 85 bar require uncompromised metallurgy (Super Duplex 2507 / 6Mo / Hastelloy C-276) and cavitation-resistant trimming to prevent localized crevice corrosion and energy dissipation across high-pressure membrane blocks.

Design Critical ParametersISO 15156 / API 6D
Working Pressure:65 – 85 bar (Cl. 600/900)
Salinity / Chlorides:35,000 – 48,000 ppm TDS
Critical Pitting Temp (CPT):> 50°C (ASTM G48-A)
Guaranteed PREN Index:PREN ≥ 42.5 Guaranteed
Sealing Integrity:Zero Leakage (API 598 Rate A)
Material: UNS S32750 / EN 1.4410verified

High-Pressure Membrane Racks

85-bar High Flux Trains

Energy Recovery System

Isobaric Rotor Pressure Exchange

Metallurgy Compliance

Zero Crevice Corrosion Verification

account_treeSWRO Process Architecture Mapping

Duty Zones & Flow Control Infrastructure

From intake ultrafiltration through 85-bar membrane pressurization and isobaric energy exchange, every valve and pump matches exact chemical aggressivity parameters.

schemaISOMETRIC PROCESS VELOCITY & PRESSURE PROFILEPFD-SWRO-2025-01
ZONE 014 - 6 bar

Intake & Pre-Treatment

Ultrafiltration, Dual Media Filters, Sodium hypochlorite dosing

settingsDuplex 2205 Butterfly
ZONE 0265 - 85 bar

HP Feed & Boosters

High-pressure booster skids, heavy manifold headers

settingsSuper Duplex 2507 TOV
ZONE 0360 - 82 bar

Membrane Trains

SWRO vessels, high velocity brine reject headers

settingsNon-Slam Spring Check
ZONE 0465 - 80 bar

Energy Recovery

Isobaric rotor chambers, pressure exchange 3-way distribution

settingsCeramic / SDX Check
ZONE 052 - 5 bar

Post-Treatment

Permeate remineralization, calcite beds, lime dosing

settings316L Resilient Seated
ZONE 01 & 02Feed & Boosters

High-Pressure Feed & Seawater Intake

Handling raw seawater prior to desalination skids requires biocide resistance and heavy mechanical isolation against surge hammering during pump cut-in.

  • check_circleDesign Pressure: 10 to 85 bar (PN16 - PN100)
  • check_circleBody Material: Duplex 2205 / Super Duplex 2507
  • check_circleCritical Concern: Marine biofouling & cavitation damage
Primary Package:VALVEX-TOV-2507-600
ZONE 03Membrane Separation

RO Membrane Trains & Brine Reject

High velocity concentrated brine creates severe turbulence and localized chloride attack on valve seats, stem packings, and manifold tie-ins.

  • check_circleChlorides: Up to 72,000 ppm in reject stream
  • check_circleTrim: Stellite 6 or Hardened 254 SMO / Ceramic
  • check_circleShutoff Class: API 598 Zero Bubble Leakage
Primary Package:VALVEX-DCV-2507-NONSLAM
ZONE 04 & 05ERD & Potable Skids

Energy Recovery & Remineralization

Isobaric pressure exchangers recover up to 98% of brine energy. Valve cycling frequency is exceptionally high, demanding instant dynamic closure.

  • check_circleEfficiency: < 2.5 kWh/m³ net power
  • check_circleCycle Life: Tested to > 250,000 rapid cycles
  • check_circlePotable Cert: NSF/ANSI/CAN 61 & BS 6920
Primary Package:VALVEX-ERD-SWRO-ISO
tuneInteractive Engineering Matrix

Desalination Equipment Selector & Package Configurator

Configure feed parameters, view certified metallurgical matches, and commit assemblies directly to your engineering RFQ basket.

verified_userNORSOK M-650 Verified Foundry Origin
ISOLATION & CONTROL

VALVEX TOV-900 Super Duplex

TAG: SWRO-TOV-2507-CL600

PREN: 43.2 Tested
BORE SIZEDN 150 – 900
RATINGPN 63 / 100
LEAK RATERate A
BODYS32750

Triple-offset conical non-rubbing seat geometry eliminates galling in chloride-heavy seawater, delivering bi-directional bubble-tight isolation with zero pitting degradation.

buildConfigure Valve
HP SEAWATER INJECTION

VALVEX SWRO-HPP Axially Split

TAG: SWRO-HPP-BB3-65

BEP Eff: 88.5%
FLOW CAPACITY450–1,800 m³/h
HEADUp to 880 m
CASING MAT.2507 / 1.4410
BEARINGSSiC Ceramic

API 610 BB3 design engineered specifically for membrane feedwater delivery. Opposed impeller arrangement balances hydraulic axial thrust without balance disk leakage losses.

buildPump Sizing Curve
DYNAMIC CHECK PROTECTION

VALVEX Non-Slam Dual Plate Check

TAG: SWRO-DCV-2507-PN100

Dynamic Closure: < 0.15s
BORE SIZEDN 100 – 600
DESIGN STDAPI 594
SPRINGSInconel X-750
SEATMetal-to-Metal

Essential membrane protection located immediately down-stream of feed pumps. Independent spring-loaded plates close prior to velocity reversal, completely eliminating catastrophic hydraulic hammer.

buildHydraulic Data
biotechQuality Assurance Standards

Rigorous SWRO Metallurgy Verification

All materials intended for seawater contact undergo mandatory destructive and non-destructive laboratory evaluation. We guarantee absolute compliance with NORSOK M-630 and ASTM international standards.

Critical Pitting TempPASS GUARANTEED
50°C (ASTM G48-A)

Zero pitting corrosion observed during 24-hour ferric chloride immersion test with weight loss under 20 mg/m².

check_circleEN 10204 3.1 & 3.2 Inspection Certifications
check_circle100% PMI Spectrometry Testing
check_circleRadiographic & Dye Penetrant NDE
SWRO METALLURGICAL TEST SCHEDULE (VALVEX STD QCP-2507)TRACEABLE HEAT NO. IDENTIFICATION
Verification ProcedureStandardAcceptance CriteriaFrequency
Ferric Chloride Pitting TestMethod A (Crevice/Pitting)ASTM G48No pitting at 50°C, weight loss < 20 mg/m²Every Heat / Cast Lot
Microstructure & IntermetallicFerrite/Austenite 40/60%ASTM A923 M-B/CZero sigma/chi phase, impact > 80J @ -40°CPer Forging Batch
Positive Material IdentificationXRF Handheld & Spark OESAPI RP 578Cr:24-26, Mo:3-5, Ni:6-8, N:0.24-0.32100% All Pressure Parts
Hydrostatic Containment TestShell & High-Pressure SeatAPI 598 / ISO 52081.5x CWP (127.5 bar on 85 bar line)100% Every Serial Unit
Fugitive Emissions VerificationHelium Leak SnifferISO 15848-1 AHLeakage < 10⁻⁶ mg·s⁻¹·m⁻¹ over 2,500 cyclesBatch Sample
Standard Certified Lab: VALVEX Materials Characterization Center, Houston TXDownload Certified MTR Sample (PDF)open_in_new
verifiedField Proven Execution

Global SWRO Reference Track Record

Over 45,000 Super Duplex valves and high-pressure pumping units active across the world's most demanding hyper-saline desalination projects.

Arabian Gulf / Middle EastCOMMISSIONED 2021

Taweelah RO Mega-Desalination Facility

World’s largest reverse osmosis plant producing 909,000 m³/day of potable water. VALVEX delivered 1,200 Super Duplex 2507 TOV-900 isolation valves across 30 identical high-pressure membrane blocks.

VALVES1,200+
SALINITY46,500 ppm
LEAKAGEZero
ASSET: CAS-SWRO-TAW-900Read Full Case Studyarrow_forward
Carlsbad / California, USARETROFIT UPGRADE 2023

Claude "Bud" Lewis Carlsbad Plant Loop Optimization

Supplying 10% of San Diego County's total potable water. VALVEX engineered dynamic non-slam check assemblies and dual-offset ceramic-seat valves to curb pressure dissipation across the isobaric ERD loop.

ENERGY RECOVERED42.8%
NET SEC2.75 kWh/m³
STANDBY LIFE> 25 Yrs
ASSET: CAS-SWRO-CBL-042Read Full Case Studyarrow_forward
contact_supportApplication Engineering Support Desk

Need Exact Metallurgy Guidance for Your SWRO Plant Project?

Our Senior Metallurgists and Flow Process Specialists provide certified Cv sizing, water hammer transient analysis, and PREN-calculated alloy selections tailored to your exact salinity and temperature data.

file_downloadDownload CAD Library (STEP / DWG)